Selected Filters


Availability


Eclipse Tools Tools and Supplies

Individual Parts

Results 26 - 50 of 57

Vise, Multi-Purpose, Multi-Angle, Aluminum, 360° Swivel Action Vacuum Base, 90° Tilt, 2-inch Metal Jaws, 2.5in. Opening, Rubber Jaw Inserts, Each

Part Number: ETL-902-117

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Desoldering Pump, Ant-Static, Mini, Each

Part Number: ETL-900-004

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Dual-Sided Organizer, 10 Removable Trays, 15 Divider Compartments, Sturdy Handle, 2 Locks Per Side, Each

Part Number: ETL-SB-3428SB

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Cable Tie Hook Tape, 8", Orange, 25 PK, Each

Part Number: ETL-900-098-OR

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

ESD Precision Tool Kit, Incl. Pliers, Screwdrivers, Tweezers, Wrist Strap, and Tool Bag, Each

Part Number: ETL-500-042

Not Yet Reviewed

Estimated Ship Date: Nov 16, 2026 if ordered today

...Loading

Estimated Ship Date: Nov 16, 2026 if ordered today

Probe & Pick Set, 4 Pcs., 1 Each Hook/Curved/Straight/Angle Tips, Stainless Steel, Vinyl Pouch, Each

Part Number: ETL-900-205

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Cable Tie Hook Tape, 8", Green, 25 PK, Each

Part Number: ETL-900-098-GN

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Non-Insulated Terminal Crimper, AWG 8-2, Carbon Steel with Black Oxide Finish, Each

Part Number: ETL-CP-351B

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Screwdriver, 9in1, Pen Style, 000/00/0/1 Phillips, 2.0/3.0 Slotted, T4/T5/T6 Star, Magnetic, Bit Storage, Knurled Anodized Aluminum, Pocket Clip, Each

Part Number: ETL-SD-9814

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Storage Wrap, Hook & Loop, Weather Resistant 900 Denier, Ballistic Nylon, 3 in. x 23 in. Holds up to 150 Pounds, Each

Part Number: ETL-902-511

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Screwdriver, 4 in 1, Pen Style, Two Double-Ended Reversable Tips, #00/#0 Phillips, 1/16in./1/8in. Slotted, Pocket Clip, Each

Part Number: ETL-800-092

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Field Service ESD Protection Kit, 26 in. x 24 in., Incl. 10 in. Grounding Cord and Wrist Wrap, Each

Part Number: ETL-900-056

5.0 out of 5 stars ( 1 )

Estimated Ship Date: Nov 16, 2026 if ordered today

...Loading

Estimated Ship Date: Nov 16, 2026 if ordered today

Soldering Iron, Battery Operated, Compact, 840°F Max Temperature, 15-20 Second Heat-Up Time, Requires 3 AA Batteries (Not Included), Each

Part Number: ETL-SI-B162

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Lunar Series Die Set, Wire Ferrules AWG 22-12, Each

Part Number: ETL-300-097

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

11-in-1 Screwdriver/Nutdriver, Each

Part Number: ETL-902-583

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Heat Shrink Tubing, Assorted Colors, Precut, 1/16 in. to 3/8 in. Width, 4in. Length, 2:1 Shrink Ratio, 160 pcs, Each

Part Number: ETL-902-460

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

ESD Wrist Wrap, Adjustable, 6 ft. Coiled Cord, Banana Plug to Alligator Clip, Each

Part Number: ETL-900-133

Not Yet Reviewed

Estimated Ship Date: Nov 16, 2026 if ordered today

...Loading

Estimated Ship Date: Nov 16, 2026 if ordered today

Tip Cleaning Tools, for SS-331E Desoldering Station, Set of 3

Part Number: ETL-5SS-331-CT

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Soldering Iron, Auto Ignite, Butane Gas, 0.51oz Capacity, approx. 90 Minute Run Time, Kit

Part Number: ETL-GS-23K

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Spare Tips, for SS-331E Desoldering Station, Set of 3

Part Number: ETL-5SS-331N-NZ

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Foot & Heel Grounding Strap, Each

Part Number: ETL-900-057

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

ESD Wrist Wrap, Elastic, 10 ft. Coiled Cord, Banana Plug to Alligator Clip, Each

Part Number: ETL-900-002

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Static Mat, 24 in. x 24 in., 158 degrees Fahrenheit (70 degrees Celsius) Heat Tolerance, Each

Part Number: ETL-900-116

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

Soldering Iron, Portable, USB, 8W, up to 896 degrees Fahrenheit, Power Indicator, Each

Part Number: ETL-SI-168U

1.0 out of 5 stars ( 1 )

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air

SMD Hot Air Rework Station, Microprocessor Control, 700W, 212°F – 842°F, Adjustable Air Flow, Auto Cool-Off, 45dB Quiet Operation, Each

Part Number: ETL-SS-969E

Not Yet Reviewed

Estimated Ship Date: Monday 11/2/2026 if shipped by air

...Loading

Estimated Ship Date: Monday 11/2/2026 if shipped by air