Availability
Stealth Antenna System Components
Antenna Matching Unit, HOA Buster, 80M-10M/70cm/33cm, +GMRS/CB, 250W PEP SSB, 125W CW, 25W Digital, SO-239, Black, Each
Part Number: ALP-HOABUSTERBLK
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Radial System, (2)20ft. Faraday Radial Strips, Conductive Fabric, (4)Tent Stakes, (1)CHA FSR-A 3/8-24in. Coupling Adapter,(2)Bungee Cords, Tan, Each
Part Number: CHA-FSR
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Radial Kit, Permanent/Portable, Vertical Antennas with 3/8-24in. Threaded Mounts, QTY-6 48in. SS Elements, SS Hardware, CHA-CAP-HAT Hub, Each
Part Number: CHA-STINGER-PERM
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Hub Kit, 1x25' Copper Clad Kevlar® PTFE (-70°C to 150°C) Wire, 1xTDL HUB, Each
Part Number: CHA-HUB-KIT
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Radial Disc, For MC-750, M10 Threaded Insert, Compatible with Chelegance Ground Spikes, (12) 4mm Banana Plugs Included, Each
Part Number: NCE-CH0010009-P2
Not Yet Reviewed
Estimated Ship Date: Nov 9, 2026 if ordered today
Estimated Ship Date: Nov 9, 2026 if ordered today
Portable Antenna Mount, Stainless Steel, Mount with 1/4-Inch Threaded Insert, Stainless Steel Bracket, U-Bolts, SO-239 Bulkhead Connector, Each
Part Number: NCE-CH0020016
Not Yet Reviewed
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Wire Set, High Performance Dipole For CHA-TD-2, 2 X 108 ft. Tinned Copper/Kevlar® PTFE Antenna Wires, 2-Cable Winders, Carabiners, Kit
Part Number: CHA-HPD
Not Yet Reviewed
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Loop Remote Tuner, Works with CHA F-LOOP 2.0, RTU Cable 20 ft., 9 VDC Battery, Kit
Part Number: CHA-LRT-2-0
Not Yet Reviewed
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Multi-Function Guying Kit, for TAC7000HDS, Each
Part Number: SBM-MFGK-7000
Not Yet Reviewed
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Booster Kit, for F-LOOP 2.0 & P-LOOP 2.0, covers 40-15 meters, Each
Part Number: CHA-BOOSTER-KIT
Not Yet Reviewed
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Multi-Function Guying Kit, for Tactical Mini Mast, Each
Part Number: SBM-MFGK-MINI
Estimated Ship Date: Monday 9/28/2026 if shipped by air
Estimated Ship Date: Monday 9/28/2026 if shipped by air