Availability
36 Results Found For "never"
Transceiver, HT, 2m/70cm, 5 W. Rugged, Compact, LED Display, 1,950 mAh Li-Ion Battery, Each
Part Number: YSU-FT-65R
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
GEAR UP WITH DXE!
Vertical Antenna Guy Kit, 3/32 in. Dacron Polyester Rope 1,000 ft. Length, 4 Screw Anchors, 15 in. Length, Kit
Part Number: DXE-GUY1000-KIT
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Battery Pack, High Capacity, 7.2 V, 2200 mAH, Li-Ion, for FT-1D, FT-2D, FT-3DR, FT-5DR, VX-8D, Each
Part Number: YSU-SBR-14LI
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Microphone, iCM, Standard Type, Black Body, Gold Screen, Single Element, Electret, w/ cable and 8-pin Round for ICOM Xcvr Only, Each
Part Number: HLS-ICM-BG
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Microphone, iCM, Standard Type, Silver Body, Silver Screen, Single Element, Electret, w/ cable and 8-pin Round for ICOM Xcvr Only, Each
Part Number: HLS-ICM
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Battery Pack, Li-ion, 7.4 V, 1370 mAh, for VX-6R, Each
Part Number: YSU-SBR-40LI
Cannot be shipped Internationally if shipped by air
Cannot be shipped Internationally if shipped by air
Tail Kit Package, for HPTG-4000I Cable, 3 x 12 ft. 3/16 in. EHS Guys, 3 x 502 Insulator, 6 Grips, 3 Thimbles
Part Number: DXE-PT-4000-3P
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Shop Lights, LED, Flood, M18 Rocket Dual Power Tower, 2,500 TRUEVIEW Lumens, White, Up To 7 ft. Extension, 18 Volt, Each
Part Number: MWT-2131-20
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Antenna, Whizz Whip, QRP, HF/VHF/UHF, 10 W Max AM/CW/SSB, 130 cm/51.18 in. Length, PL-259, Each
Part Number: MKR-13-425
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Bearing Bypass Ground Kit, for 2 in. Mast, 25G/45G Tower Leg, Each
Part Number: DXE-BBGK-2-25-P
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Tilt Base Mount Plate, Stainless Steel, w/Tilt Plate for Ant Mast, Req. 2 ea. SSVC-2P for Mounting Pipe, Kit
Part Number: DXE-TB-4P
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Tilt Base Mount Plate, Stainless Steel, for Hy-Gain Verts., Requires 2 ea. SSVC-2P for Mounting Pipe, Kit
Part Number: DXE-TB-6P
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Contest Console Switching Unit, for Icom Radios, Transceiver Memory Keyer, Use on Mic Input, Each
Part Number: SBM-CONTESTCONSL
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Flashlight, M18 Search Light, LED, Spot Light, Flood Light, Emergency Flasher, Battery Not Included, Each
Part Number: MWT-2354-20
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
APRS Transceiver Module, Temperature and Air Pressure Sensor, Micro USB Port, Status LED, Each
Part Number: WMO-PICOAPRSLITE
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Flood Light, M18 ROVER Dual Power, LED, 4,000 Lumens, 18 Volt Lithium Ion, Each
Part Number: MWT-2366-20
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2026 if ordered today
Special Offer
Buy this M18 Tool and get a FREE CP2.0 Battery!
Estimated Ship Date: Nov 3, 2026 if ordered today
Air Mattress, AirBedz Lite, Green, Full Size, 63 in. Width, 75 in. Length, 12 in. Height, Each
Part Number: ABZ-PPI-PV202C
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Air Mattress, AirBedz Lite, Green, Mid Size, 55 in. Width, 72 in. Length, 12 in. Height, Each
Part Number: ABZ-PPI-PV203C
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Extended Base Upgrade for MBVE-5 Antenna, Elevated Tuner Mount Only with Hdwr., for MFJ-998(not incl.), Kit
Part Number: DXE-MBVE-5UG-RT
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Tilt Base Mount Plate for COMTEK 40VA and 30 VA Verticals, Requires 2 ea. SSVC-2P for Mounting Pipe, Kit
Part Number: DXE-TB-7P
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Tilt Base Mount Plate for COMTEK COM-20VA Verticals, Requires 2 ea. SSVC-2P for Mounting Pipe, Kit
Part Number: DXE-TB-8P
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Milwaukee M12 Packout Flood Light, LED, USB Charging Port, Each
Part Number: MWT-2356-20
Not Yet Reviewed
Estimated Ship Date: Nov 3, 2026 if ordered today
Estimated Ship Date: Nov 3, 2026 if ordered today
Auxiliary Battery Isolator and Smart Charger, ISOpwr+, Solid-State, Auto-Off 12.6 Vdc Threshold, 40 A, Each
Part Number: WMT-58401-1044
Not Yet Reviewed
Estimated Ship Date: Jan 12, 2027 if ordered today
Estimated Ship Date: Jan 12, 2027 if ordered today
Extended Base Upgrade for MBVE-5 Antenna, Elevated Tuner Mount Only with Hdwr., for MFJ-993BRT or -994BRT, Kit
Part Number: DXE-MBVE-5UG-BRT
Not Yet Reviewed
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Estimated Ship Date: Monday 10/19/2026 if shipped by air
Butane Soldering Iron Kit, Pro 120, Inc. Pro 1.6 mm Conical & Torch Tip, Temp. 480-1000 degrees F, Each
Part Number: ISO-7977
Not Yet Reviewed
Estimated Ship Date: Nov 2, 2026 if ordered today
Estimated Ship Date: Nov 2, 2026 if ordered today
DX Engineering Vertical Antenna Guying Kits DXE-GUY1000-KIT