Availability
Tower Section, Top, Mast Tube Type, 9.75 ft. Overall Height, 25G Series, Each
Part Number: ROH-25AG2
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Tower Base Plate, Self-supporting, 25G Series Compatible, Each
Part Number: ROH-25GSSB
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Tower Base Plate, Hinged Type, 25G Series Compatible, Each
Part Number: ROH-BPH25G
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Mast, Telescoping, 5 Sections, 2.25 in. Bottom O.D., 1.25 in. Top O.D., 34.1 ft. Max.Height, Ground Ship, Each
Part Number: ROH-9H50
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Tower Section, Straight, 45G Series, 1.25 in. Leg Diameter, 16.75 in. Leg Spacing, 10 ft. Overall Height, Each
Part Number: ROH-45G
Not Yet Reviewed
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Side Arm Assembly, 2 Bracket Type, Fits 25G, 45G, 55G, 65G, 2.5-3.0 ft. Adj., With 3 ft. x 2.25 in. OD Pipe, Kit
Part Number: ROH-SA253UA
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Tower Bearing Plate, 16 in. Height, 25G Series, Each
Part Number: ROH-BPL25G
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Guy Bracket Assembly, 25G Series, Kit
Part Number: ROH-GA25GD
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Mast, Telescoping, 5 Sections, 2.25 in. Bottom O.D., 1.25 in. Top O.D., 43.9 ft. Max. Height, Truck Ship, Each
Part Number: ROH-H50
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Wall Bracket, Heavy Duty, for Bracketed only ROHN G-Series, Adj. Wall Clearance 18-36 in., 48 in. Wide, Each
Part Number: ROH-HBUTVRO
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Tower Short Base, 25G Series, Hinged, Tubular Leg Type, 3.33 ft Height, Each
Part Number: ROH-SBH25G
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Tower Top Plate, Hot-Dipped Galvanized Steel, Pre-Drilled, Hardware Included to Bolt to 55G Main Section, Each
Part Number: ROH-APL-55G
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
Guy Bracket Assembly, 45G Series, Kit
Part Number: ROH-GA45GD
Estimated Ship Date: Nov 9, 2026 if ordered today
Estimated Ship Date: Nov 9, 2026 if ordered today
Tower Section, Top, Mast Tube Type, 9.50 ft. Overall Height, 45G Series, Each
Part Number: ROH-45AG2
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
Tower Base Plate, Pier Pin Type, 55G Series Compatible, Each
Part Number: ROH-BPC55G
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
Tower Short Base, 55G Series, Straight, Tubular Leg Type, 5 ft Height, Each
Part Number: ROH-SB55G
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
House Bracket, Assy. for Guyed ROHN 25G tower, Adj. 0-36 in., Each
Part Number: ROH-HB25CG
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Work Platform, for ROHN 45G Tower, Steel, Galvanized, 14 lbs., Each
Part Number: ROH-WP45G
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
Tower Base Plate, Direct Ground Drive-In Mount, Guyed or Bracketed ROHN 25G only, Steel, Galvanized, Each
Part Number: ROH-SDB25G
Not Yet Reviewed
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Guy Bracket Assembly, 55G Series, Kit
Part Number: ROH-GA55GD
Not Yet Reviewed
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
Tower Bearing Plate, 45G Series, Each
Part Number: ROH-BPL45G
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
Tower Assembly/Disassembly Tool, G Series, Aligns Tower Legs, Each
Part Number: ROH-ROHNJACK
Estimated Ship Date: Dec 8, 2026 if ordered today
Estimated Ship Date: Dec 8, 2026 if ordered today
Roof Mats, Rubber, 1/4 IN Thick, For ROHN BRM4 Series Mounts, Set
Part Number: ROH-BRM4PAD1
Not Yet Reviewed
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Torque Bar, Single Bar, three required for ROH-GA25GD, Steel, Gavanzized, Each
Part Number: ROH-TB25D
Not Yet Reviewed
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Grounding Kit, Tower Base, 55G/65G-Series Towers, Single Leg Ground, 15 ft. 7/16 in. Wire Rope, 10 ft. Ground Rod, Ground Rod Clamp, Kit, Each
Part Number: ROH-BGK2GGX
Not Yet Reviewed
Estimated Ship Date: Monday 9/14/2026 if shipped by air
Estimated Ship Date: Monday 9/14/2026 if shipped by air