Availability
14 Results Found For "antenna hardware"
Lightning Rod Kit, for Mast Top, Incl. Clamps for 3 in. Mast, Fasteners, 5/8 in. D. x 4 ft. L. Rod, Each
Part Number: DXE-LRMM-3-458B
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
GEAR UP WITH DXE!
Lightning Rod Kit, for Mast Top, Incl. Clamps for 2 in. Mast, Fasteners, 5/8 in. D. x 4 ft. L. Rod, Each
Part Number: DXE-LRMM-2-458B
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Lightning Rod Kit, for Mast Top, Incl. Clamps for 3 in. Mast, Fasteners, 5/8 in. D. x 4 ft. L. Rod, Each
Part Number: DXE-LRMM-3-458BS
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Lightning Rod Kit, for Mast Top, Incl. Clamps for 2 in. Mast, Fasteners, 5/8 in. D. x 4 ft. L. Rod, Each
Part Number: DXE-LRMM-2-458BS
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Thrust Bearing, For 1.5 to 2.0 in. OD Rotating Vertical Tower Mast, c. 2021 Upgraded Stainless Steel Ball Bearings and Races, SS Hardware Incl., Each
Part Number: DXE-TB300
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Thrust Bearing, For 2.5 to 3.0 in. OD Rotating Vertical Tower Mast, c. 2022 Upgraded Stainless Steel Ball Bearings and Races, SS Hardware Incl., Each
Part Number: DXE-TB400
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Tower Base Plate, Flat Roof, 25G Series Compatible, Bolts Directly to Roof, No Attachment Hardware, Each
Part Number: ROH-FR25G
Not Yet Reviewed
Estimated Ship Date: Dec 30, 2026 if ordered today
Estimated Ship Date: Dec 30, 2026 if ordered today
Tower Section, Mid, Amerite 45 Series, 16.75 in. Leg Spacing, 10 ft. Overall Height, Each
Part Number: TOW-AME45
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Tower Section, Mid, Amerite 55 Series, 17 in. Leg Spacing, 10 ft. Overall Height, Each
Part Number: TOW-AME55
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Tower Section, Base, Amerite 55 Series, 5 ft. Height, Each
Part Number: TOW-AME55-B5
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Tower Section, Top, Amerite 25 Series, with Removable 1-1/4 in. Mast Bushing, 9 ft. Height, Each
Part Number: TOW-AME25-TRB
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Top Section, Amerite 25 Series, 9.75 ft. Overall Height, 2 1/4 in. Tube on Top, Each
Part Number: TOW-AME25-AG2E
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Tower Section, Top, Amerite 45 Series, 9 ft. Height, 2 in. Mast Tube, Each
Part Number: TOW-AME45-T
Not Yet Reviewed
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Estimated Ship Date: Monday 10/5/2026 if shipped by air
Tower Section, Top, Amerite 25 Series, 9 ft. Height, Extended Mast Tube, Each
Part Number: TOW-AME25-EMT
Not Yet Reviewed
Estimated Ship Date: Dec 21, 2026 if ordered today
Estimated Ship Date: Dec 21, 2026 if ordered today
DX Engineering Lightning Rod Kits DXE-LRMM-2-458B