Selected Filters


Filters


Momobeam Mono3-17 Monoband Yagi Antennas

Not Yet Reviewed

Momobeam Mono3-17 Monoband Yagi Antennas are full size, three element systems engineered to deliver excellent SWR bandwidth, optimal gain, and strong front to back
Momobeam Mono3-17 Monoband Yagi Antennas are full size, three element systems engineered to deliver excellent SWR bandwidth, optimal gain, and strong front to back performance across the 17 meter band. These antennas remain lightweight for easy handling while offering the durability required to withstand harsh weather conditions.

Built on a robust square boom, the MONO3-17 antennas arrive with an assembly tool, spare hardware (bolts and aluminum tubing), and clearly labeled components. Every bag of hardware and each aluminum tube is individually marked to ensure a quick, accurate, and frustration free assembly pro
Momobeam Mono3-17 Monoband Yagi Antennas are full size, three element systems engineered to deliver excellent SWR bandwidth, optimal gain, and strong front to back performance across the 17 meter band. These antennas remain lightweight for easy handling while offering the durability required to withstand harsh weather conditions.

Built on a robust square boom, the MONO3-17 antennas arrive with an assembly tool, spare hardware (bolts and aluminum tubing), and clearly labeled components. Every bag of hardware and each aluminum tube is individually marked to ensure a quick, accurate, and frustration free assembly process.

Designed for installation flexibility, these antennas may be mast mounted or side mounted on towers, and they require a medium duty rotor for proper operation. To further enhance performance and reliability, each antenna includes a 3kW RF choke balun as standard equipment—an upgrade many manufacturers offer only as a premium option.

Results 1 - 1 of 1

Antenna, Yagi, Mono3-17, 17 meters, 3 Elements, 10kW, Square Boom Length 14.44 ft., Turning Radius 12.47ft., 3kW Choke Balun Incl., Each

Part Number: MOO-MONO3-17

Not Yet Reviewed

Estimated Ship Date: Feb 2, 2027 if ordered today

...Loading

Estimated Ship Date: Feb 2, 2027 if ordered today

  • 1
  • Page 1 of 1